GAMI Injectors, Powerflow Exhaust, Useful Load 978, Complete Logbooks, Annual Due 03/2025, IFR Due 01/2025, All AD's Complied With, NKDH. The plane went through an extensive inspection at a Mooney service center, the landing gear was adjusted back to factory specs, and the flight controls were checked, etc. The elevator down springs were replaced at the last annual.Compressions at last annual 78, 78, 79, 79-New Concorde battery installed 11/2023-New Whelen LED navigation, strobes, and landing light installed 4/2023-New alternator and voltage regulator installed 2/2023-New fuel servo and divider installed 1/2024-500 hour magneto IRAN completed 1/2024